APS Power Distribution

Product description

Take me directly to Range of services

Power Distribution is the most critical components of any system and lighting is no exception particularly these days when almost every fixture now needs its own mains power source. However with each fixture needing power, new problems are introduced particularly during the power up sequence.

Firstly, in-rush currents of all the power supplies and lamps starting up at the same time often causes main breakers to trip and secondly the transient currents drawn by the power supplies cause earth protection breakers to trip. To avoid these effects results in complicated power up sequences usually requiring a human sitting there switching circuits on one at a time.

The new LSC APS distribution units are a solution to this and other problems by controlling the power-on sequence of each of the individual output circuits. In its simplest form, a single command starts the sequence and then each of the 12 outputs is turned on one output at a time with a programmable time before the next circuit turns on. In this way the peak current drawn is always low and upstream breakers will not trip.

APS units can be connected together where more than 12 circuits are required and the units automatically cascade - that is, the second unit won't commence its start up sequence until the first has finished.

Contact details

LSC Lighting Systems (Aust) Pty. Ltd.

65-67 Discovery Road
3175 Dandenong South, Vic.
Australia

Contact

Please log in to view users’s details

Range of services

Take me directly to Our products
  • Automatic power On/Off of circuits when DMX is detected;
  • 12ch DMX relay and/or Auto Power
  • Combined MCB and RCD (RCBO) breakers - circuit breaker with earth leakage protection (RCD/GFI) for each circuit;
  • RCBO breaker also provides Neutral Disconnect function.
  • Staggered power up of outputs to prevent overloading of the supply feed breakers (cascading of multiple units is also possible);
  • Control via DMX512 - presence detected turns outputs on and loss of DMX turns outputs off after a preset time delay eg. 19 minutes;
  • Control via GPI contact closure;
  • Control via RDM;
  • Cascading startup for individual units via XLR5 cabling and/or based on unit number;
  • Manual override via front panel;
  • 10A, 13A, 16A & 25A variants;
  • Operation on any mains voltage in the range of 100-240V per phase.
  • Monitoring of input voltages (3-phase), frequency and currents;
  • Programmable overvoltage and undervoltage trips to protect loads;
  • Voltage and current reporting via RDM;
  • Three phase operation;

Single phase operation possible but input current must be limited to 63A in total;

Additional products

Product

Mantra Lite

The Mantra is simple – make control of LED fixtures easy and intuitive, while still allowing control...

LSC Lighting Systems (Aust) Pty. Ltd. 65-67 Discovery Road 3175 Dandenong South, Vic. Australia

Product

GEN-VI

In acknowledgement of the changing demands of the marketplace, LSC has introduced a new intelligent...

LSC Lighting Systems (Aust) Pty. Ltd. 65-67 Discovery Road 3175 Dandenong South, Vic. Australia

Product

CLARITY LX-SERIES

The LX consoles are available in 3 models. The Flagship LX900 comes with 2 banks of 15 motorised...

LSC Lighting Systems (Aust) Pty. Ltd. 65-67 Discovery Road 3175 Dandenong South, Vic. Australia

Product

UNITY

UNITY is the next generation of installation dimming and power switching for controlling the latest...

LSC Lighting Systems (Aust) Pty. Ltd. 65-67 Discovery Road 3175 Dandenong South, Vic. Australia